SECTOR: DOMESTIC
APPLIANCES
APPLICATION : painting
PROBLEM:
The realization in a washing machine factory with production of a
painting plant of shells of different dimensions in different colours
in lots of varying quantities. In addition the plant had to permit
different pre-treatment processes and at the same time to optimize
the production of washing machines with relation to the scheduled
assembling program. |
Specifications
:
- different materials of washing machine shells which means different
pre-treatment processes;
- the need to reduce the time between the painting of the shells
and their application on the washing machine assembly line (daily
output schedule);
- the need to reduce the buffers of the various shell models already
painted and waiting to be assembled.
|
|
 |
SOLUTION :
The plant is based on System 2000 P & F overhead conveyors and consists
of three lines to carry out the pre-treatment: one for the 8 stage
pre-treatment and two of these to effect the 9 stage pre-treatment.
The lines are linked with the painting installations by two high-speed
recycling loops.
The painted items are then addressed and stored in five different
buffers in accordance with the washing machine assembly schedule.
The adopted control and software enable to combine during loading
operations the trolley code to the shell code thus making possible
to address the trolleys to the scheduled process, the buffer and the
assembly line in which it will be used. The plant control also includes
a self-diagnosis system to identify malfunctions and it is furthermore
connected to the top level information system. |
|