|
SECTOR: CAR
COMPONENTS
APPLICATION: painting
PROBLEM:
The realization of a mass production painting plant for plastic
spoilers and bumpers which will be flexible in that it will be possible
to paint both different sized products and lots of different volumes.
|
Specifications:
- the need to create a plant within a closed space with air filtering
and thus the need to create an extremely compact plant both in
terms of surface area and volume.
- varying product dimensions, which means different stay times
in the various treatment areas;
- the need for high productive capacity (one skid every 45 seconds).
|
|
 |
SOLUTION :
The painting plant has been realized using System 08 ground pallet
conveyors (500 m in total) and has been laid out on three floors interconnected
by continuous lifts. All the loading, unloading and pre-treatment
operations take place on the first floor.
The second floor has been set out in such a way as to accommodate
all painting operations while the third floor houses the ovens and
dryers in addition to the air filtering and conditioning plants.
The skids have been especially designed for carrying a pair of spoilers
or bumpers and are capable of moving along both the major and minor
axes, thus increasing buffer capacity.
The software controls the speed of the master (painting) chain and
automatically synchronizes this with that of the slave chains.
The plant is further supplied with a self-diagnosis system which speeds
up the starting time after malfunctioning. Finally, statistical processing
of these malfunctions allows for targeted preventive maintenance.
|
|